Business area

Smart Building Companies Leading the Future

Geosanis an engineering company specializing in the design and supervision of fire, electrical, and mechanical facilities.
For the safety and efficiency of buildings, we prepare high-quality designs by applying the latest technologies and specifications, and conduct accurate and prompt supervision.
In addition to meeting customer requirements, we strive to provide sustainable design and supervision that takes into account the public interest and environment.

We will realize our customers' vision based on our years of experience and expertise in the fire and electricity sectors and contribute to the development of the construction industry.
Engineering

Geosan E&G Co., Ltd. has successfully carried out various projects
in the field of fire and electricity.

We have consistently conducted the design and supervision of the fire and electricity sectors in large complexes, public institutions, industrial facilities, schools, and hospitals, increasing customer satisfaction and safety.
We are actively responding to the latest trends and changes in fire and electricity, and continue to upgrade our knowledge and skills.

I want to work with pride and responsibility as a leader in fire and electricity.

1. Fire Protection Design and Supervision

1.1. Fire fighting design

1.1.1. Concept of Fire Protection Design
The design of fire fighting facilities is the work of determining the type, size, and location of fire fighting facilities installed in buildings for fire prevention and fire extinguishing.
1.1.2. Major statutes and technical standards to be applied when designing fire fighting facilities
- Fire Protection Basic Act -

Act on Fire Prevention, Installation and Maintenance of Fire-Fighting Facilities, and Safety Management, Enforcement Decree, and Enforcement Rules
Building Act, Enforcement Decree, and Enforcement Rules
New collection of fire-fighting facility laws and regulations provided by the National Fire Agency, etc
Fire Safety Performance Standards (NFPC) and Technical Standards (NFTC) (1-38)
Rules on standards for evacuation and fire prevention structures, etc. of buildings
1.1.3. Operation of Fire Protection Design
1) Analysis of Fire Risk in Buildings and Facilities
2) Fire Alert and Detection System Design
3) Fire Extinguishing Facility Design
4) Establishment of life-saving plans in fire situations
5) Establishment of countermeasures and procedures in case of fire
6) Establishing an Emergency Evacuation Plan
7) Evacuation Route and Emergency Exit Design
8) Emergency lighting and emergency power system design
9) Establishment of fire prevention and safety training program in building
10) Review fire-related regulations and compliance
11) Evaluation of Fire Safety in Building Structures
12) Establish emergency measures to cope with fire
13) Estimate loss and damage from fire
14) Establishment of fire maintenance and inspection plan
15) Establish emergency contact networks and action plans in the event of a fire
16) Establish cooperation and countermeasures with police, paramedics, fire departments, etc. in the event of a fire
17) Ensuring proper equipment and tools for fire control in buildings
18) Create fire-related documents and report
19) Production of educational materials for fire prevention and safety education in buildings
20) Establishment of budget and cost plan related to installation and maintenance of fire fighting facilities in buildings
1.1.4. Professional firefighting design business
The professional fire fighting facility design business specializes in designing fire fighting facilities in buildings. This work plays a very important role in protecting the safety and life of buildings. The professional fire fighting facility design business designs various fire fighting facilities to prevent and respond to fire in buildings.

In general, the professional firefighting facility design business performs the following tasks.

· 건축물의 소방설비 설계 및 시공관리
· 소화용수 설계 및 시공관리
· 화재탐지 및 화재경보 설계 및 시공관리
· 비상구 및 비상계단 설계 및 시공관리
· 화재시 대피 계획 수립 및 시뮬레이션
· 화재안전교육 및 훈련 등
The professional firefighting facility design business designs various firefighting facilities according to the size, purpose, and number of people in the building, and the work is carried out in accordance with the building laws, fire laws, and related regulations in Korea. This task requires specialized skills and experience and is carried out by experts with specialized knowledge and skills in fire fighting facility design.
1.1.5. Step-by-step procedures for fire-fighting design
Planning stage of fire fighting design: Identify the standards for installing fire fighting facilities according to the purpose, structure, scale, etc. of the building and set the goal and scope of fire fighting design.
Basic Design Steps for Fire Protection: Determine the layout and composition of fire-fighting facilities based on the floor plan, elevation, and sectional drawings of the building, and calculate the performance and capacity of each facility. In addition, prepare the necessary documents in accordance with the fire-fighting laws and relevant standards.
Fire Protection Design Stage: Make detailed representations of what is determined in the basic design and prepare the drawings and specifications required for construction. In addition, performance verification and safety assessments are carried out for each facility, and review and corrections are reflected.
Fire Protection Design Completion Stage: Review and obtain approval for drawings and documents completed in the implementation design. Additionally, perform installation reporting and permitting procedures and enter into contracts with the contractor.

1.2. Supervision of the fire service

1.2.1. Concept of fire supervision

<표 1.2.2.1> Fire-fighting administrative procedures



1.2.2. Procedures for fire supervision
Supervision contract: The supervisor and the client determine the scope, duration, cost, etc. of the supervision work.
1) Design supervision
① Review the type and quantity of fire fighting facilities required according to the purpose, structure, size, etc. of the building and verify that the design drawings and documents conform to laws and standards. Also, if a design change is required, approval for change is granted.
② Review the safety during the design stage of a building or facility. Review the layout of the building, the location of the entrance and exit, the evacuation route in case of fire, and the installation of fire fighting equipment. To do this, you must comply with the design form and relevant regulations under the Building Act.

2) Construction supervision
① Review the construction plan and construction standards prepared by the contractor, check whether they are properly constructed in accordance with the design drawing, relevant laws and technical standards, and conduct technical guidance on quality and construction management. On-site, inspect the layout and construction of fire fighting facilities. In addition, solve problems that occur during construction and conduct performance and completion tests.
1.2.3. Major performance tasks
· Review and approval of design drawings and documents
· Review and approval of construction plans and construction standards
· Prepare on-site inspection and supervision logbooks
· Resolution of problems arising during the inspection and construction of fire fighting facilities, construction conditions, performance inspections, etc
· Conduct a completion inspection and prepare a completion report
· Suggestion of Fire Protection Maintenance Plan
· Prepare and submit a report on the results of supervision work

- Additional work
· Establishment and simulation of response plan in case of fire
· Rapid response and support for fire fighting activities in the event of a fire
· Fire Safety Training and Training Support
· Support the establishment and implementation of fire-fighting facility installation and maintenance plans
· Support the establishment and implementation of fire prevention and safety management plans
· Support for examination of building approval and use approval
· Assistance in fire hazard analysis and evaluation
1.2.4. Types and scope of supervision business
Sortation Technical manpower standards Scope of supervision
Professional fire service supervision business ㆍA fire engineer
ㆍOne special supervisor in the field of machinery and electricity
ㆍOne high-quality supervisor in the mechanical and electrical fields
ㆍOne intermediate supervisor in the mechanical and electrical fields
ㆍOne person each for beginner supervisors in the field of machinery and electricity
Supervision of Fireworks in All Buildings
1.2.5. Types of construction works subject to fire supervision and the placement of supervisors
Resident Corporation Supervision Target Supervisor's rank
Resident Corporation Supervision ㆍa building with a total floor area of 30,000 square meters or more
ㆍmore than 500 apartments with 16 floors or higher, including basement floors
Fire engineer, Special Supervisory Service
General construction supervision ㆍConstruction of fire-fighting facilities that do not fall under resident construction supervision a special, high-end, intermediate, and elementary supervisor
1.2.6. Standards for the placement of supervisors
Responsible supervisor Auxiliary supervisor Criteria for Fire Protection Facilities Construction Site
Fire engineerBeginner Supervisory Service or higher 1) Construction site of a specific fire-fighting object with a total floor area of 200,000 square meters or more
2) Construction site of a specific fire-fighting object with 40 floors or more, including underground floors
More than a special supervisorBeginner Supervisory Service or higher 1) Construction site of a specific fire-fighting object (excluding apartments) with a total floor area of 30,000 square meters or more and less than 200,000 square meters
2) Construction site of a specific fire-fighting object whose number of floors, including underground floors, is not less than 16 floors but less than 40 floors
More than a high-end supervisory centerBeginner Supervisory Service or higher 1) Construction site of a specific fire-fighting object in which a water-spray lamp fire extinguishing facility (excluding a hose-drill type fire extinguishing facility) or a smoke-free facility is installed
2) Construction site of an apartment with a total floor area of 30,000 square meters or more and less than 200,000 square meters
More than an intermediate supervisor 1) Construction site of a specific fire-fighting object with a total floor area of 5,000 square meters or more and less than 30,000 square meters
Beginner Supervisory Service or higher 1) Construction site of a specific fire-fighting object with a total floor area of less than 5,000 square meters
2) Underground construction site
1.2.7. Subject to supervision
⦁ When establishing, opening, or expanding indoor fire hydrant facilities ⦁ When establishing or opening sprinkler facilities, etc. (excluding cabinet-type simple sprinkler facilities), or adding protection and waterproofing areas
⦁ When establishing or opening a new water spray lamp fire extinguishing facility (excluding a hose reel-type fire extinguishing facility), or adding a protective and waterproof area
⦁ When establishing, opening, or expanding outdoor fire hydrant facilities
⦁ When establishing or opening automatic fire detection facilities
⦁ When establishing or opening emergency broadcasting facilities
⦁ When establishing or opening an integrated monitoring facility
⦁ When an emergency light is newly installed or opened
⦁ When a fire extinguishing water facility is newly established or opened
⦁ When constructing the following fire extinguishing activities facilities according to the following items
- When establishing or opening smoke-making facilities or expanding smoke-making areas
- When establishing or opening connected water pipe facilities
- When establishing or opening a connected water spray facility or adding a water supply area
- When establishing or opening emergency outlet facilities or adding dedicated circuits
- When establishing or opening wireless communication auxiliary facilities
- When establishing or opening a new combustion prevention facility or adding a spray zone

2. Electrical Design and Supervision of Electrical Construction

2.1. Electrical design

Important considerations in the electrical design of buildings are as follows.


Building usage and number of people: The appropriate power capacity should be calculated by considering the use of the building and the number of people, and the appropriate lighting equipment and outlet location should be determined.

Electrical Safety Regulations: Domestic and international electrical safety regulations regarding the installation of electrical equipment must be observed.

Electrical Safety: Protective devices such as ground, circuit breaker, and short circuit breaker must be installed to ensure the safety of electrical equipment inside the building.

Environmental requirements: The location selection and wiring composition of the electrical installations inside the building should take into account environmental requirements (humidity, temperature, dust, etc.).

Reliability: To increase the reliability of the electrical installation, a backup installation should be installed in critical areas, which requires separate space and power supply to be considered.

Energy Saving: As electricity bills rise and the need to conserve energy increases, there is a need to reduce electricity usage by introducing energy-saving electrical equipment and energy management systems.

Convenience: The convenience of electrical equipment inside a building is an important factor in enhancing the convenience of building users. The location and type of lighting, switches, and outlets should be installed in consideration of the user's convenience.

Lighting Design: Lighting design is a factor to be considered to ensure proper lighting inside the building, such as the type of lighting, the location of the lighting, and the intensity of the light.

Communication System : The electrical equipment inside the building should also include the communication system. It should be designed with the communication system installation location and configuration of the Internet, telephone, CCTV, etc. in mind.

Maintenance : The electrical installation inside the building requires long-term maintenance. Therefore, the configuration and installation location of the facility should be configured and deployed to facilitate and efficient repair and maintenance.

2.2. Electrical Construction Supervision

- Electrical construction supervision refers to the technical review and supervision of the construction and maintenance of electrical facilities conducted at the electrical construction site.

- The procedure of supervision is based on the guidelines for performing the construction supervision of power facilities.

- It will be implemented during the supervision period specified in the contract for electrical work.

- It manages the entire process of facility construction, maintenance, safety inspection, and commissioning.

- Evaluate and review the quality, safety, reliability, and economic feasibility of electrical equipment.

- The supervisory authority must have technical knowledge and expertise in the supervisory process.

- Identify, correct and prevent defects or problems that may occur during the construction process in advance.

- Prepare a supervision journal, inspection report, etc. and keep the supervision results in documents.

- Understanding and compliance with relevant laws, standards, and standards is essential.

- You should be able to identify the needs and objectives of the customer and suggest an optimized structure and operation of the facility.

3. Mechanical Equipment Design, Supervision and Performance Inspection

3.1. Design and supervision of mechanical equipment

3.1.1. General Principles of Mechanical Equipment Design – Technical Standards for Mechanical Equipment Article 6
1) Design reasonably considering the entire process of construction, supervision, maintenance, etc. of mechanical equipment
2) Design by separating the type of engineering in other fields, such as mechanical equipment and construction, so that it does not interfere with the process management and facilitates the classification of defect responsibilities
3) Review the priority use of design and environmentally friendly facilities for energy conservation
4) Review the applicability of new technologies and new construction methods
3.1.2 General Principles of Mechanical Equipment Construction – Technical Standards for Mechanical Equipment Article 7
1) Observe the schedule, construction plan, etc. of mechanical equipment construction work
2) Establish an appropriate construction plan suitable for the field conditions by fully reviewing the mechanical equipment design drawings, specifications, load and equipment selection statements (hereinafter referred to as "design drawings")
3) Construction shall be carried out according to design drawings, detailed construction drawings, etc. so that mechanical facilities can fully perform their functions
3.1.3. Standard for design and construction of mechanical facilities [Attachment] 1~14
Sortation Category Sortation Category
Asterisk1 Heat source equipment and air conditioning equipment Asterisk9 Duct facility
Asterisk2 Air-conditioning equipment Asterisk10 Thermal insulation equipment
Asterisk3 Ventilation system Asterisk11 Automatic control equipment
Asterisk4 Aanitary equipment Asterisk12 Soundproof, dustproof, and dustproof equipment
Asterisk5 Water supply and hot water supply facilities Asterisk13 Plant facilities
Asterisk6 Wastewater, ventilation, and drainage facilities Asterisk14 Special facilities
Asterisk7 Sewage purification and water reuse facilities Asterisk15 Mechanical Equipment Maintenance
Asterisk8 Plumbing equipment
3.1.4. Design and Construction Considering Maintenance - Technical Standards for Mechanical Equipment Article 9

1) Mechanical facilities shall be designed and constructed in accordance with the following criteria for efficient maintenance.


① Facilitate the maintenance of equipment, pipes, ducts, and various accessories that constitute mechanical equipment
② If necessary, the maintenance costs of machinery and equipment can be shared, individual control, or integrated control
③ To secure at least a minimum space for maintenance and maintenance of mechanical facilities, such as inspection holes

2) Design and construction standards taking into account the maintenance and management of machinery facilities under paragraph (1) shall be as specified in attached Table 15.

3.2. Mechanical Equipment Performance Inspection

3.2.1. Relevant laws and regulations

1) Mechanical Equipment Maintenance Standards Article 11 (Performance Inspection)


① The management entity shall conduct a performance inspection at least once a year from the date of completion of the relevant building, etc. (referring to the date of approval for use or approval for completion of construction, etc. (hereinafter referred to as the "baseline date") by referring to the maintenance guidelines under Article 6, the current status table of machinery facilities subject to inspection in attached Form 1, the results of maintenance conducted pursuant to Article 9, and the matters to be reviewed when inspecting the performance of machinery facilities under attached Table 3.
- omit -

③ The performance inspection under paragraph (1) shall be conducted by using equipment under attached Table 7 (3) of the Decree, and the management entity shall record the results in the inspection table subject to the performance inspection of mechanical facilities in attached Form 3 after completing the inspection and preserve the results thereof.
④ Where the head of the Special Self-Governing City, the Governor of the Special Self-Governing Province, the head of the Si/Gun/Gu requests the submission of inspection records pursuant to Article 17 (3) of the Act, the management entity shall prepare and submit a report on the results of the performance inspection of mechanical equipment in attached Form 4.

2) Article 7 of Mechanical Equipment Maintenance Standards (Establishment of Maintenance and Performance Inspection Plan)


② When the management entity intends to conduct a performance inspection under Article 11, he/she shall prepare a performance inspection plan for mechanical facilities, including the following matters: In such cases, the performance inspection of the heat source and cooling and heating facilities shall be conducted every other year by separating the cooling and heating facilities. 

1. Manpower input plan and equipment status for performance inspection 
2. The quantity of mechanical equipment subject to performance inspection calculated in accordance with the criteria in attached Table 2 
3. Safety and Quality Management Measures during Performance Inspection

3) Buildings subject to performance inspection


By April 17th of 2024 (every year), owners or managers of mechanical facilities installed in buildings of a certain size or larger must comply with the maintenance standards of mechanical facilities, check the performance required for maintenance, and prepare inspection records.
Buildings subject to performance inspection Base date Deadline (annual)
- Buildings with a total floor area of 30,000 square meters or more - Multi-family home with more than 2,000 households 2023.8.9 2024.8.8
- Buildings with a total floor area of 15,000 square meters or more and less than 30,000 square meters - Multi-family housing with more than 1,000 households and less than 2,000 households - Public Buildings, etc. Notified by the Minister of Land, Infrastructure and Transport 2023.4.18 2024.4.17
- Buildings with a total floor area of 10,000 square meters or more and less than 15,000 square meters - Multi-family housing with more than 500 households and less than 1,000 households - Centralized (regional) heating apartment with 300 or more households and less than 500 households 2023.4.18 2024.4.17
※ Penalty: KRW 3 million for the first violation (not conducted), KRW 4 million for the second violation, KRW 5 million for the third violation
3.2.2. Mechanical Equipment Performance Inspection Procedures


Quotation inquiry
· Click below an online inquiry ↓↓
· Customer Center 1:1 Inquiry Quotation Request
Professional counseling
· Understand the size and purpose of construction
· Understand the current status of mechanical facilities
Confirmation of quotation and conclusion of contract
· Submitting an estimate
· Conclusion of performance inspection contract
Report Submission
· Mechanical Equipment Performance Inspection
· Submission of report and issuance of performance inspection certificate

※ Status of technical personnel retention※

· Two fire engineers – Professional design, professional supervision, disaster prevention consulting
· Two Electrical Engineers – Professional Design, General Supervision, Electrical Safety Consulting
· Information and communication technician 1 person – Information and communication design business, supervision business, smart GR type receiver
· One mechanical engineer – Design, supervision, and performance inspection of mechanical equipment
· Two architects – architectural design, supervision, dismantling supervision
· Four fire fighting facility managers – comprehensive inspection, operation inspection, safety management
· Corporate Affiliated Research Institute – 5 patents and 4 researchers
· More than 30 industry-leading experts, including 10 top engineers